BACKGROUND:
The 20,000 square foot basement area
of this NYC agency-occupied space experienced both water infiltration
and a flood from a defective sump pump, causing extensive mold and microbial
contamination. EMTEQUE was tasked to perform multiple services at this
site, which included conducting a microbial survey; preparation of a scope
of work for all remediation activities; coordinating a site walk-through
and managing the subsequent three-bid process; performing HVAC duct cleaning
and disinfecting services; supervising all remediation activities; in
addition to final airborne microbial testing, clearance, reporting and
project close-out.